|
شامل 4 مقاله ISI چاپ شده، 4 علمی پژوهشی و 8 کنفرانس و 2 مقاله ISI تحت بررسی به شرح زیر می باشد:
[1] Seyed-Hosseini S M, Sabzehparvar M: A mathematical model for the continuous time/resource trade-off
problem. Kuwait journal of science and engineering, No. 1B-Vol.35: 197-215, June 2008 (ISI).
[2] Sabzehparvar M, Seyed-Hosseini S M (2008): A mathematical model for the multi-mode resource constrained
project scheduling problem with mode dependent time lags.Journal of supercomputing 44 No. 3 : 257 - 273 (ISI).
[3] Sabzehparvar M., Abdi R., Gasemzadeh H. R., (2009): Modeling and resource allocation of agricultural Mechanization projects with GERT networks. International Journal of Food, Agriculture and Invironment-JFAE Vol 7 (3&4)-2009.
[4] Seyed-Hosseini S M, Sabzehparvar M, Nouri S (2007): A genetic algorithm for the resource constrained project
scheduling problem with multiple crashable modes. International journal of Iran sience and technology-IUST
, (2007) No. 3-4. Vol. 18: P. 6-18. (علمی پژوهشی-چاپ شده).
[5] Sabzehparvar M, Seyed-Hosseini S M, Nouri S (2008): A mathematical model for the resource investment problem.
Journal of Industrial Engineering International (JIEI),Vol 4, No. 7, July 2008: 25-32 (پذیرش شده -علمی پژوهشی).
[6] Seyed-Hosseini S M, Sabzehparvar M (2007): A geometrical model for the multi-mode resource constrained project scheduling problem. Business Research Yearbook of the International Academy of Business Disciplines, Florida
USA Vol XIV 1, 149-155 (چاپ شده -علمی پژوهشی و کنفرانس).
[7] مجید سبزه پرور، رضا عبدی، حمید رضا قاسم زاده، مدلسازي و آناليز فرايند پروژه مکانيزاسيون يونجه با شبکههاي گرت. (1388). مجله علمی پژوهشی . دانش کشاورزی پایدار دانشگاه تبریز.
[8] Sabzehparvar M, Seyed-Hosseini S M, Nouri S (2007): A mathematical model for the resource investment problem.
The 5th International conference of industrial engineering Iran sience and technology, ( چاپ شده- کنفرانس).
[9] Sabzehparvar M, Seyed-Hosseini S M (2007): A mathematical model for the multi-mode resource constrained
project scheduling problem. journal of construction engineering, (ISI- under review after minor revision).
[10] Sabzehparvar M, Seyed-Hosseini S M (2007): A mathematical model for the resource constrained project scheduling
problem with multiple crashable modes. Applied mathematical modeling, (ISI- under minor review).
[11] - مجید سبزه پرور، محمد سعید جبل عاملی ، سید علیرضا میر محمد صادقی ، (1383)، توسعه یک متدولوژی جامع برای بهینه سازی . . همزمان پارامترهای پروژه ، مجموعه مقالات سومین کنفرانس بین المللی مدیریت پروژه ، 185-174.
|